Miniburst Pipe Bursting System
- Winch placed into manhole 1. (See attached data sheet)
- Winch rods inserted into old pipe from manhole 1 and connect to head in manhole 2
- Head winched into old pipe, which is broken and displaced
- New Pipe is located in shield on rear of head and held in place by simple tensioning device.
- Head is again winched forward. New pipes are snapped together behind the head as it is winched forward.
- Above step is repeated until full length is in place.
Downloads