Miniburst Pipe Bursting System

  • Winch placed into manhole 1. (See attached data sheet)
  • Winch rods inserted into old pipe from manhole 1 and connect to head in manhole 2
  • Head winched into old pipe, which is broken and displaced
  • New Pipe is located in shield on rear of head and held in place by simple tensioning device.
  • Head is again winched forward. New pipes are snapped together behind the head as it is winched forward.
  • Above step is repeated until full length is in place.

Product Overview

Same Day Shipping

Stock Items, ordered by 1pm

Quality guaranteed

ISO 9001 registered company

Need Help?

+44 1642 769 789